New Energy Vehicle Special Safety Test System

New Energy Vehicle Special Safety Test System

  • It's used for electrical safety testing of electric vehicles, including tests like whole vehicle insulation, charging port insulation, and potential equalization.
  • Complies with various international regulations, such as ECE R 100,GTR No.20, GB 18384.
  • It can detect vehicles from various countries, like European-standard cars, American-standard cars, Japanese-standard cars, and Chinese-standard cars.
01
Potential balance, insulation resistance, leakage current, vehicle insulation, insulation monitoring verification, capacitive coupling...
02
Record the vehicle VIN number and main component numbers, identify product categories, automatically match testing programs.
03
Can perform test data filtering, conditional queries, report generation, achieve data traceability, and assist in product quality analysis.
04
True color LCD display, menu-style operation; side panel equipped with cable connection device.
05
Test items, hardware docking, software interaction, and testing plans can be customized according to different vehicle models.
06
Allowing different test items to be set according to different vehicle models.
07
Each test item independently setting the corresponding parameters.
08
The testing system is designed using advanced testing technology.

Equipment Introduction

1、Basic Knowledge of New Energy Vehicle Testing

Potential Equalization Test: Potential equalization is achieved by physically connecting the exposed conductive parts of electrical equipment to a reference point or equipotential point on the vehicle body (usually the chassis) to minimize the potential difference between them. This connection ensures that, in the electrical system, especially in high-voltage systems, the conductive parts maintain the same potential, thereby reducing the risk of electric shock and other safety hazards.

Insulation Resistance Test: The electrification level of new energy vehicles is higher than that of traditional cars. Under harsh operating conditions (car vibrations, external environmental humidity and temperature), or in the event of a collision or rollover, the insulation performance between the high-voltage circuit and the vehicle chassis may be reduced, leading to vehicle fires and endangering the safety of drivers and passengers. The higher working voltage of new energy vehicles places higher demands on the insulation performance between the high-voltage electrical system and the vehicle chassis.

Whole vehicle insulation test: The high-voltage components of electric vehicles are a parallel structure, and the insulation resistance of the entire system is the parallel value of all high-voltage component insulation resistances. According to GB-T 18384-2015 Electric Vehicle Safety Requirements, the minimum insulation resistance requirement: DC 100Ω/V, AC 500Ω/V.

Insulation Monitoring Verification: In high-voltage electrical systems of electric vehicles, if insulation failure occurs, it will pose serious safety hazards. To ensure that the vehicle can promptly send an alarm signal to the driver in case of insulation failure, the vehicle should have an insulation resistance monitoring function.

Capacitive Coupling Test: Capacitive coupling refers to the amount of stored charge on the Y capacitor of the vehicle’s high-voltage bus (all B-level voltage circuits of the vehicle) at the maximum battery voltage.


2、Workstation layout:

Safety test system test items can be flexibly configured:

On production lines with high requirements for rhythm, corresponding one or two test items can be assembled at suitable stations according to the vehicle assembly progress;

When the beat requirement is relatively low in non-production lines, more comprehensive test items can be optionally selected.

 

3、New Energy Testing Project Selection

Test item

Parameters

Component potential balancing

32A DC/600mΩ

Charging port potential balancing

Insulation Resistance of Load

1000V DC/10GΩ (optional 3GΩ/50GΩ)

Charging port insulation resistance

Leakage current

300V AC/18mA

Complete vehicle insulation

0.2-100MΩ

Insulation Monitoring Verification

Resistivity coefficient Rx: 100-1000;

Capacitive coupling

1、Calculation method (recommended);

2、Actual measurement (long testing time, not recommended);

1000V DC/2000mJ;

The above testing project manufacturers can consider the actual needs, production rhythm, etc., for station layout. Yidi testing system can flexibly combine the above testing projects.


Related Products

0.060289s